- ML13102A303 - Part 21 Involving a Potential Weld Defect.
- ML13099A228 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Correction to Acceptance Review LAR Re: Addition of Analytical Methodologies to Technical Specification 5.6.5 and a Change to Safety Limits Critical Power Ratio or Unit 2 (TAC NOS. MF0877, MF0878, & MF0879)
- ML12017A186 - Browns Ferry, Units 1, 2 and 3, Revised Submittal Schedule for License Amendment Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection For Light Water Reactor Generating Plants, 2001 Edition.
- ML13101A311 - LER 13-001-00 for Brown Ferry Nuclear Plant, Units 1, 2 and 3 Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis.
- ML13101A308 - LER 13-001-00 for Watts Bar Nuclear Plant, Unit 1, Sequoyah Nuclear Plant, Unit 1 & 2 and Browns Ferry Nuclear Plant, Unit 1, 2, & 3.
I was going to run the Run Through The Roses, but I'm pretty sure I'll be coming off of a night shift. I've done it before, but I'm thinking I'll sit this one out. I WILL (just signed up) be doing the Cotton Row (10K and 5K) on May 27. Info and sign up...