Just the stuff the NRC put up for Browns Ferry last week (7/26/09 - 8/2/09):
U1 & Sitewide
Analysis of NRR Response to ACRS Memorandum Concerning the Browns Ferry Nuclear Station 105% Power Uprate.
Meeting Minutes of the ACRS Subcommittee on Plant Operation and License Renewal Regarding Browns Ferry Unit 1 Restart and License Renewal Application, September 21, 2005.
U2
Browns Ferry Nuclear Plant, Unit 2 - Request For Withholding Proprietary Information From Public Disclosure (TAC MD5263).
Browns Ferry, Unit 2 - Technical Specifications Change TS-418 - Extended Power Uprate - Unit 2 Steam Dryer Analyses.
CDI Technical Note No. 08-13NP, Rev. 1, "Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2," Enclosure 6.
CDI Report No. 09-13NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Page 63 through 128, Enclosure 4.
CDI Report No. 09-13NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Introduction through Page 62, Enclosure 4.
CDI Report No. 08-05NP, Rev. 4, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz," Enclosure 5.
U3
Nothing additional
Wednesday, August 05, 2009
Sunday, August 02, 2009
Navy News Service - Eye on the Fleet
The linked picture of 2 ships side-by-side by itself is pretty run of the mill. However, when you consider the airpower present on the flight deck of the USS George Washington, the old saying 4.5 acres of freedom is reinforced. The higher resolution picture is pretty good!
Navy News Service - Eye on the Fleet
Shared via AddThis
Navy News Service - Eye on the Fleet
Shared via AddThis
Subscribe to:
Posts (Atom)