Just the stuff the NRC put up for Browns Ferry last week (7/26/09 - 8/2/09):
U1 & Sitewide
Analysis of NRR Response to ACRS Memorandum Concerning the Browns Ferry Nuclear Station 105% Power Uprate.
Meeting Minutes of the ACRS Subcommittee on Plant Operation and License Renewal Regarding Browns Ferry Unit 1 Restart and License Renewal Application, September 21, 2005.
U2
Browns Ferry Nuclear Plant, Unit 2 - Request For Withholding Proprietary Information From Public Disclosure (TAC MD5263).
Browns Ferry, Unit 2 - Technical Specifications Change TS-418 - Extended Power Uprate - Unit 2 Steam Dryer Analyses.
CDI Technical Note No. 08-13NP, Rev. 1, "Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2," Enclosure 6.
CDI Report No. 09-13NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Page 63 through 128, Enclosure 4.
CDI Report No. 09-13NP, Rev. 0, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements," Introduction through Page 62, Enclosure 4.
CDI Report No. 08-05NP, Rev. 4, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz," Enclosure 5.
U3
Nothing additional