- ML110450256 - Browns Ferry, Units 1, 2 and 3 - Response to NRC Request for Additional Information Regarding Extending Completion Times for Technical Specification 3.8.1.
- ML11216A118 - Submittal of Reference Documents Related to EA-11-018 for Browns Ferry Nuclear Plant Unit 1.
- ML112200505 - cROP Tabletop Example Findings.
- ML11213A209 - LER 09-003-01 for Browns Ferry, Unit 2, Regarding Safety/Relief Valve As-Found Setpoint Exceeded Technical Specification Lift Pressure.
- ML11214A100 - LER 09-003-03 for Browns Ferry, Unit 3 Regarding Reactor Core Isolation Cooling System Inoperable Longer Than Allowed by the Technical Specifications.
- ML112210368 - IR 05000259-11-003, 05000260-11-003, 05000296-11-003; 04/01/2011 - 06/30/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Annual Heat Sink Performance, Operability Evaluations.