Saturday, June 04, 2011

Madison Run Through The Roses 10k and 5k | Madison, Alabama 35758 | 2011-09-10;Summer runs in Huntsville, AL;Weekly NRC docs for Browns Ferry

Madison Run Through The Roses 10k and 5k | Madison, Alabama 35758 | 2011-09-10

It was a slight annoyance to see that the Run Through The Roses had been moved yet again, but it's all in the interest of keeping folks from killing themselves by trying to overdo it. A number of folks ended up needing treatment during/after the Cotton Row Run.


However, I don't think that the Huntsville Track Club's Summer Cross Country Runs will be canceled due to the heat. It's just a given that the temperatures will be soaring. I hope to make some or all of the Tuesday night runs. The runs start June 7 @ 6:30 PM at the Huntsville Running Park. Be warned, it's normally quite warm during these runs...


  1. ML110870254 - Advises that,based on deferred status of facility,statement re revised corporate procedures on inventory methods & training requirements inapplicable,per Insp Repts 50-259/87-29,50-260/87-29 & 50-296/87-29.
  2. ML110870207 - Forwards "Environ Radioactivity Levels,Bellefonte Nuclear Plant,Annual Rept - 1986" & "Environ Radioactivity Levels, Browns Ferry Nuclear Plant,Annual Rept 1986."
  3. ML110840239 - Forwards master work policies for plants,including Endorsements 1,2 & 3 to NELIA Certificates NW-105 & 154 & Endorsements 1,2 & 3 to MAELU Certificates MW-39 & MW-185 & certificates of insurance.
  4. ML11144A288 - LER 10-002-01 for Browns Ferry, Unit 1, Regarding Drywell Pressure Instrument Channel Inoperability Due to Improper Instrument Tubing Slope.
  5. ML11132A118 - Bellefonte, Units 1 and 2 - Proposed Regulatory Framework for the Possible Completion of Construction Activities.

Wednesday, June 01, 2011

Congrats...

To Endeavour and her crew and NASA in general on 19 years and 25 trips into/returns from space for Endeavour!

Tuesday, May 31, 2011

Bunny in the backyard; NRC docs for BFN 5/21/2011 - 5/28/2011

From 2011-05-31



  1. ML110980538 - Cyber Security Plan Implementation Schedule.
  2. ML11136A187 - 2011/04/26 NRR E-mail Capture - Audit Results Summary Report Supporting TAC ME3775 - BF1 AREVA Fuel Transition and related BF2/3 Request
  3. ML111400373 - FEMA Ltr: Statement of Continuation of Reasonable Assurance for Browns Ferry Nuclear Power Plant Restart.
  4. ML111400477 - IR 05000259-11-402, 0500260-11-402, and 05000296-11-402, on 02/18/2011 (Corporate Office) & 04/21/2011 (K.Polson & members staff at plant), Browns Ferry Nuclear Plant, NRC Security Inspection.
  5. ML11122A113 - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Unit 1 - RAI Regarding Decommissioning Funding Status Report (TAC Nos. ME5455, ME5456, ME5457, ME5535, ME5536, and 5551).
  6. ML11137A199 - Browns Ferry, Unit 1, Response to NRC Request for Additional Information Regarding to Transition to AREVA Fuel (TAC No. ME3775).
  7. ML102880526 - LER 10-001-00 for Browns Ferry, Units 1, 2 & 3, Regarding Appendix R Safe Shutdown Instruction Procedures Contain Incorrect Operator Manual Actions.
  8. ML111460511 - NRC Reply To Browns Ferry November 2010 Letter Regarding Response to Inspection Report No 2010004 and EA 10-215.
  9. ML11145A066 - Brown Ferry Nuclear Plant, Units 2 & 3 - Request for Additional Information Regarding a Request to Eliminate Low Pressure Coolant Injection Pump Motor Generator Sets (TAC ME5796 AND ME5799).


On a slightly different tack, the NRC had a public meeting at Browns Ferry today to discuss the annual performance assessment of our plant. In the wake of the Japan earthquake and the storms at the end of April and Browns Ferry being in the media about a valve failure from the 4th quarter of 2010, there were a decent number of folks present. The NRC does a decent job of getting information from these meetings posted within a week or so. Hopefully there will be a transcript.

I could posit my opinion on many of the concerns that were brought up at today's meeting, but that would take a LONG time. Perhaps I'll use an occasional post here and there to talk about a different concern that was brought up. I will note that the usual fear, uncertainty and doubt that can commonly be associated with anti-nuclear folks was present in spades today. Everyone I work with has GREAT respect for the power of the atom. A healthy sense of respect does not translate to fear. The effects of accidents (particularly severe accidents like Fukushima and Chernobyl) breed that sense of respect. However, when the public at large is presented with partial truths (occasionally driven by political agendas and/or personal gain for the presenter(s)) and not necessarily well versed in the operation of nuclear plants or statistical bases of accident risk analysis, that fear will present itself. I'm NOT going to say that accidents can't or won't happen. They already have. However, I can say that the folks I worked with in Illinois and the folks I work with here (and I'm willing to say every operating nuclear unit in this country) do everything we can to ensure that:

a)the likelihood of any major accident occurring is extraordinarily small, and

b)if a problem does occur, we are trained and ready and able to keep any and all consequences to a minimum

After 9/11, many changes were made throughout the industry. As a result of those changes, I believe we are safer than ever before. After Japan, there will be many more changes and I think we will have an even better margin to a catastrophic event.