  1. ML11307A424 - Browns Ferry, Units 1, 2, & 3, Sequoyah, Unit 1 & 2, Watts Bar, Units 1 & 2, Bellefonte, Unit 1 - Re-submittal of Attachments for Responses to Hydrology Action Items.
  2. ML11307A426 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Page 62 - 100.
  3. ML11307A416 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 101 - 151.
  4. ML11307A417 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 152 - 174 through Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing Pages 175 - 201.
  5. ML11307A425 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 9 - 61.
  6. ML11307A418 - Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing, Pages 202 - 241.
  7. ML11307A419 - Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing, Pages 242 through Appendix C14.
  8. ML113081618 - Enclosure 1 - U.S. Army Corps of Engineers, "Flood-Fighting Structures Demonstration and Evaluation Program: Laboratory and Field Testing in Vicksburg, Mississippi," July 2007.
  9. ML11307A420 - Enclosure 2 - Wenck Associates, Inc., "Engineering Evaluation of Hesco Barriers Performance at Fargo, ND 2009," May 2009.
  10. ML11307A421 - Recipients of Technical Reports & Information.
  11. ML11308A030 - Comment (2) of Tom Clements on behalf of Friends of the Earth, on Draft Strategic Plan about Testing of Plutonium Fuel (MOX) Made from Weapons-Grade Plutonium Required for NRC to License MOX use in Boiling Water Reactors.
  12. ML11308B347 - Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Transmittal of Nuclear Quality Assurance Plan, Revision 25, TVA-NQA-PLN89-A.
  13. ML11308A018 - Browns Ferry, Units 1, 2, and 3, One-Time Inspection Procedure, 0-TI-565, Rev. 0003.
  14. ML112351225 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 1.
  15. ML112351230 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 2.
  16. ML112351237 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 3.
  17. ML11312A187 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Project Manager Reassignment.
  18. ML113180503 - IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection Report.