Saturday, January 12, 2013

Trying to be a little creative; NRC docs for Browns Ferry from 12/22/12 - 1/12/13




  1. ML12354A111 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Generic Letter 96-05 Class "D" Joint Owners' Group Motor Operated Valves.
  2. ML13002A029 - Tennessee Valley Authority, Part 21 Report - Belden Wire Used on Environmentally Qualified Form-Wound Motors Not Fully Qualified.
  3. ML12361A007 - LER 12-008-01 for Browns Ferry Nuclear Plant Unit 1 regarding Standby Gas Treatment System Train C Inoperable Longer Than Allowed by Technical Specifications.
  4. ML13003A297 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Project Manager Reassignment.
  5. ML12356A039 - Browns Ferry, Units 1, 2 and 3, Sequoyah, Units 1 and 2 - Decommissioning Funding Plans for Independent Spent Fuel Storage Installations.
  6. ML13007A099 - Annual Letter - Generic Fundamentals Examination (GFE) Section for Region II.
  7. ML13008A186 - Notification of Potential Part 21 - Anti-Rotation PIN Failure in 10-Inch Anchor Darling (Flowserve) Double Disc Gate Valve.
  8. ML13008A321 - Browns Ferry Nuclear Plant, Unit 1, Anti-Rotation Pin Failure in Anchor Darling (Flowserve) Double Disc Gate Valve.
  9. ML12348A571 - Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2 - Reassignment of Branch Chief for Plant Licensing Branch II-2.
  10. ML130030074 - "Browns Ferry Nuclear Plant, Unit 2 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report."
  11. ML13002A487 - Tennessee Valley Authority (TVA) - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Task F.
  12. ML13002A488 - "Browns Ferry Nuclear Plant, Unit 1 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report."
  13. ML13002A486 - "Browns Ferry Nuclear Plant, Unit 3 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report."
  14. ML13002A446 - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Revision to the Emergency Response Data System.
  15. ML13003A177 - LER 12-006-02 for Browns Ferry Nuclear Plant, Unit 1, "High Pressure Coolant Injection System Turbine Failed to Trip Using the Manual Trip Pushbutton".