The following items were placed into ADAMS regarding Browns Ferry for the week between 3/23/13 and 3/30/13:
  1. ML13074A051 - LER 13-001-00 for Browns Ferry Nuclear Plant, Unit 3, regarding Inoperable Emergency Diesel Generators Due to Failed or Degraded Electric Generator Casing Fan Bearings.
  2. ML13081A079 - Correction Letter to the Nuclear Energy Institute concerning the Ground Motion Model Update Project Response letter dated March 20, 2013.
  3. ML13084A005 - Browns Ferry Nuclear Plant, Emergency Preparedness Inspection Notification And Request For Information.
  4. ML071210236 - Enclosure 5, Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, Changes to the Offsite Dose Calculation Manual 2006.
  5. ML071210233 - Enclosure 3, Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, Effluent and Waste Disposal Annual Report 2006.
  6. ML13085A339 - Notification of Potential Part 21 Report re Diesel Fuel Injectors Failed a Pressure Test.
  7. ML13079A238 - 11/15/2012 Summary of Meeting with the Tennessee Valley Authority (TVA) to Discuss Proposed Fuel Type Change (TAC Nos. ME8766, ME8767 and ME8768).
  8. ML13087A401 - PNO-II-13-004A - Browns Ferry, Unit 1, Update-Unplanned Shutdown Greater Than 72 Hours Due to Reactor Feedwater Heater Level Control line Leak.
  9. ML13080A076 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Notification of Completion of Revision to the Emergency Response Data System.
  10. ML13080A023 - LER 12-003-01 for Browns Ferry, Unit 2, Regarding 480V Reactor Motor Operated Valve Board 2E Failed to Manually Transfer to Alternate Power.
  11. ML13080A077 - Browns Ferry Nuclear Plant, Unit 1, Revised Reply to a Notice of Violation, EA-11-018.
  12. ML13080A075 - Browns Ferry Nuclear Plant, Unit 2, Core Operating Limits Report for Cycle 18 Operation.
  13. ML13080A078 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Response to Inspection Procedure 95003 Information Request.



Well, I'm now all signed up for the Chick-Fil-A run this coming weekend. I think it will be slightly challenging coming off a night shift and going to run a 10K. Should be fun! If the current forecasts are right, Saturday morning should be pretty nice...