Tuesday, February 11, 2014

Slacktivism; Slackin' - NRC docs 1/18 - 2/8/14; Winter Winds 2014 picture

It is certainly slacktivism, but please check out the info from the "Today We Fight Back" banner below (2/11/14 only)


NRC documents posted into ADAMS for 1/18/14 - 2/8/14:

  1. ML14022A098 - Press Release-II-14-001: NRC Schedules Regulatory Performance Meeting for Browns Ferry Nuclear Plant.
  2. ML13358A068 - NEDO-33445, Rev.0, "Browns Ferry Unit 1, Pressure and Temperature Limits Report (PTLR) Up to 25 and 38 Effective Full-Power Years."
  3. ML13358A067 - Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, "RCS Pressure and Temperature Limits" (BFN TS 484).
  4. ML14017A353 - Sequoyah Nuclear Plant, Units 1 and 2 and Browns Ferry Nuclear Plant, Units 1 and 2 and 3 - Project Manager and Backup Reassignments.
  5. ML14015A404 - Browns Ferry, Units 1, 2 and 3, Attachment 6 - NDQ099920010019 - Ex-Containment Removal Coefficients for Alternative Source Term Analyses, through Attachment 11 - List of Regulatory Commitments.
  6. ML14015A403 - Browns Ferry, Units 1, 2, and 3 - Proposed Technical Specification Change to Revise the Leakage Rate through MSIVs-TS-485.
  7. ML14014A240 - 01/30/2014 Meeting Notice with Public to Discuss the Results of the Follow-up Inspection of the items Identified in Confirmatory Action Letter of August 22, 2013 (ML13232A105) and the status of the NRC's performance assessment of Browns Ferry Unit 1.
  8. ML14028A191 - Browns Ferry Nuclear Plant - Notification Of Inspection And Request For Information.
  9. ML14027A742 - IR 05000259-13-014, 05000260-13-014, 05000296-13-014; 12/02/2013 - 12/13/2013; Browns Ferry Nuclear Plant, Unit 1, 2, & 3; Follow-up Inspection - Inspection Procedure (IP) 92702.
  10. ML14017A078 - 2013/12/24 NRR E-mail Capture - BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 � ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126)
  11. ML13233A205 - Response Regarding Licensee Dose Assessment Submittal Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident.
  12. ML14031A412 - Browns Ferry U3 2014002 ISI RFI Final - Copy.
  13. ML14023A005 - 2014/01/22 NRR E-mail Capture - MF3260 - Browns Ferry Unit 1 - Application to Modify TS 3.4.9, "RCS Pressure and Temperature (P/T) Limits - NRC Acceptance Review Results



Happy running