Saturday, August 04, 2012

NRC docs for Browns Ferry 7/29/12 - 8/4/12; Check out my Athens/Huntsville bundle

  1. ML12202A001 - LER 12-006-01, for Browns Ferry Nuclear Plant Unit 1, regarding High Pressure Coolant Injection System Turbine Failed to Trip using The Manual Trip Pushbutton.
  2. ML12209A391 - 07/25/2012 Browns Ferry Regulatory Conference Meeting Summary.
  3. ML12212A333 - 08/09/2012 Meeting Notice with Browns Ferry to Discuss the Status of TVA's Preparations for NRC Supplemental Inspection in Accordance with Inspection Procedure 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input,” at the Browns Ferry Nuclear Plant.
  4. ML11189A217 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendments Regarding Request to Add Technical Specification 3.7.3, "Control Room Emergency Ventilation System," Action to Address Two CREV Subsystems Inoperable.
  5. ML12208A019 - LER 12-004-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Manual Reactor Scram During Startup Due to Multiple Control Rod Insertion.
  6. ML12208A018 - LER 12-006-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Main Steam Relief Valves' Lift Settings Outside Technical Specifications Required Setpoint.
  7. ML12208A017 - LER 12-003-00, for Browns Ferry Nuclear Plant, Unit 3, Regarding Automatic Reactor Scram Due to De-Energization of Reactor Protection System from Actuation of 3A Unit Station Service Transformer Differential Relay.
  8. ML12215A131 - Press Release-II-12-050: NRC Schedules Public Meeting Aug. 9 to Discuss Status of Inspections at Browns Ferry Nuclear Power Plant.