Monday, November 21, 2011

My latest "arrangement"; Krispy Kreme results; NRC docs for Browns Ferry the week of 11/12-11/19/11

Find more artists like Vejadu at Myspace Music


2011 Krispy Kreme run - those who met the challenge
2011 Krispy Kreme run - those who did not meet the challenge
2011 Krispy Kreme run - Corporate team results
2011 Krispy Kreme run - Community team results

  1. ML11307A424 - Browns Ferry, Units 1, 2, & 3, Sequoyah, Unit 1 & 2, Watts Bar, Units 1 & 2, Bellefonte, Unit 1 - Re-submittal of Attachments for Responses to Hydrology Action Items.
  2. ML11307A426 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Page 62 - 100.
  3. ML11307A416 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 101 - 151.
  4. ML11307A417 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 152 - 174 through Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing Pages 175 - 201.
  5. ML11307A425 - Chapter 2 Laboratory Testing and Evaluation of Expedient Flood-Fighting Barriers, Pages 9 - 61.
  6. ML11307A418 - Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing, Pages 202 - 241.
  7. ML11307A419 - Chapter 3 Site Selection, Characterization, Instrumentation, and Field Testing, Pages 242 through Appendix C14.
  8. ML113081618 - Enclosure 1 - U.S. Army Corps of Engineers, "Flood-Fighting Structures Demonstration and Evaluation Program: Laboratory and Field Testing in Vicksburg, Mississippi," July 2007.
  9. ML11307A420 - Enclosure 2 - Wenck Associates, Inc., "Engineering Evaluation of Hesco Barriers Performance at Fargo, ND 2009," May 2009.
  10. ML11307A421 - Recipients of Technical Reports & Information.
  11. ML11308A030 - Comment (2) of Tom Clements on behalf of Friends of the Earth, on Draft Strategic Plan about Testing of Plutonium Fuel (MOX) Made from Weapons-Grade Plutonium Required for NRC to License MOX use in Boiling Water Reactors.
  12. ML11308B347 - Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Transmittal of Nuclear Quality Assurance Plan, Revision 25, TVA-NQA-PLN89-A.
  13. ML11308A018 - Browns Ferry, Units 1, 2, and 3, One-Time Inspection Procedure, 0-TI-565, Rev. 0003.
  14. ML112351225 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 1.
  15. ML112351230 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 2.
  16. ML112351237 - 2010 DFS Report Analysis for Brown s Ferry Nuclear Power Station, Unit 3.
  17. ML11312A187 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Project Manager Reassignment.
  18. ML113180503 - IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection Report.

Supercommittee
FAIL!

Wednesday, November 09, 2011

And people think that the Feds should own the healthcare system....

Just another data point on why I'm skeptical of the Federal government being able to do much. Sure, we didn't have an emergency, but the Feds were going to do their national EAS test today. The EAS system has been around since 1997 and was preceded by the Emergency Broadcast System (1963-1997). There were plenty of media outlets where initial appearances are that the test didn't work. Keep in mind, this was a government system that has essentially been around for nearly 50 years.

FAIL!

Sunday, November 06, 2011

The challenge (I was unsuccessful) and one great pic of family....



From Nov 6, 2011 part 2

Today is the day. I will try to do one of the most utterly ridiculous things that I have ever tried to do...

It's name.... the "Dare to be Great"!!!

For the time being, I will just say that it is 21 scoops of ice cream (for a total of 11 pounds of the stuff) and an additional 2 pounds of toppings.

In one hour...

Pictures (sorry, no potential aftermath pictures) to follow later....

Wish me luck!

Saturday, November 05, 2011

Some new pix; Browns Ferry docs for the past week posted in ADAMS



  1. ML112990211 - Forwards binders & sets of divider tabs for use w/NEDO-21888 "Mark 1 Containment Program Load Definition Rept."
  2. ML112990249 - Forwards EDS Nuclear,Inc list of BWRs & piping sys which could have been impacted by deficient computer program. GE has no record of reanalysis for Cooper piping sys.
  3. ML112990235 - Forwards Feb 1979 program activity review re Mark I containment program.
  4. ML112990220 - Forwards Jan 1979 Mark I containment program activity review.Lists meetings held & provides brief task-by-task summary.
  5. ML112990214 - Forwards NEDO-21885, "Mark I Containment Program,Downcomer Reduced Submergence,Functional Assessment Rept."
  6. ML112231888 - Forwards NEDO-21885, "Mark I Containment Program,Downcomer Reduced Submergence,Functional Assessment Rept."
  7. ML112990247 - Forwards summary of EDS Nuclear,Inc resolution/documentation of elbow flexibility error which existed in versions of PISOL piping analysis computer program from Jan-Oct 1969. Review & reanalysis included all work through Dec 1970.
  8. ML112990208 - Submits Dec 1978 program activity review,comprised of info from selected sections of monthly rept,w/section on contract & billing status removed.Lists meetings held & provides task-by-task activity summary.
  9. ML11298A080 - Browns Ferry Nuclear Plant, Units 2 and 3 - Follow-up Letter to 10 CFR 50.9, "Completeness and Accuracy of Information," Notification.

Tuesday, October 25, 2011

NRC docs for BFN for LAST week (10/15 - 10/22); Book'n It for Priceville 10K; A surprise...

Here are the documents that NRC placed in ADAMS regarding Browns Ferry for the dates 10/15 - 10/22:

  1. ML112800679 - Browns Ferry Initial Exam 2011-302 Final Sim/IN-Plant JPMs.
  2. ML112800671 - Browns Ferry Initial Exam 2011-302 Final Simulator Scenarios.
  3. ML112800690 - Browns Ferry Initial Exam 2011-302 General Correspondence.
  4. ML11286A145 - Browns Ferry - Updated Final Safety Analysis Report, Amendment 24.
  5. ML11291A134 - M111018B - Slides, Briefing on Browns Ferry Unit 1.
  6. ML112911370 - Press Release-11-200: Opening Remarks of NRC Chairman Gregory B. Jaczko at the Meeting to Discuss Safety Challenges of the Brown s Ferry Nuclear Power Plant.
  7. ML11285A048 - LER 11-007-00 for Browns Ferry, Unit 1, Regarding Multiple Containment System Isolations from Loss of RPS M-G Set 1B.
  8. ML11292A161 - 10/07/11 Summary of Meeting with Beyond Nuclear Regarding their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors
  9. ML11292A162 - 10/07/11 Transcript of Proceedings for Meeting with Beyond Nuclear Regarding their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors.
  10. ML11286A109 - ANP-3015(NP), Revision 0, "Browns Ferry, Units 1, 2 & 3, LOCA Break Spectrum Analysis," Enclosure 6.
  11. ML11286A108 - ANP-3035(NP), Revision 0, "AREVA Responses to August 2011 RAIs for Browns Ferry, Unit 1 Fuel Transition - LOCA," Enclosure 3.
  12. ML11286A107 - Browns Ferry, Unit 1 - Response to NRC Request for Additional Information Regarding Amendment Request to Transition to AREVA Fuel.



I was exceedingly stoked to break the 50 minute mark for a 10K run this past Saturday. The overall results are here. Speaking of runs, there's a little 5K run in downtown Huntsville this Saturday called the Spooktacular 5K. Come run or walk! You can even wear a costume! I'll be dressed up...



Check out this marsupial I heard walking around my front door last week...

From 2011-10-20