Tuesday, November 19, 2013
WAFF is touting a report that talks about Browns Ferry and radiological hazards posed to North Alabama
They're supposed to do a report on Thursday. The commercials they are running almost make it sound like they have exclusive access to this piece. If I'm right about what they are talking about, they don't. The report was created by several anti-nuclear concerns in North Alabama (and elsewhere) and published by a small local publishing company. I have my own opinions regarding the report, but you can draw your own.
2013 Krispy Kreme Challenge results; NRC docs about Browns Ferry for 11/9/13 - 11/16/13; We Run Huntsville
- ML13309A747 - The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report.
- ML082401219 - NRC Bulletin 96-003, "Potential Plugging of ECCS Strainers by Debris in BWRs."
- ML082490807 - NRC Bulletin 95-002, "Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode."
- ML13274A657 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Interim Staff Evaluations and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NOS. MF0881, MF0882, and MF0883).
For a LOT of pictures from the Dizzy 50 and the 2013 Krispy Krreme Challenge, visit http://werunhuntsville.smugmug.com/Other-1/2013-Dizzy-50/i-B9dd89r! The individual responsible for the pictures does a great job and covers many Huntsville races. Here's me right before the finish line:
Sunday, November 10, 2013
NRC docs regarding Browns Ferry for the week of 11/2/13 - 11/9/13
- ML13305A672 - Public comments to Petition Review Board (PRB) of Paul Gunter 2.206 Petition filed 03/21/2013 Requesting Agency Revocation of Operating Licenses for General Electric Mark I and Mark II Boiling Water Reactors.
- ML13305A609 - Comments to PRB for Paul Gunter 2.206 Petition to NRC.
- ML13304B418 - Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns.
- ML13277A314 - Browns Ferry Nuclear Power Plant - Submittal of After Action Report/Improvement Plan From 2013 Plume Exposure Exercise Conducted on June 5, 2013.
- ML13309B059 - License Amendment Request Marked-up Page Corrections.
Monday, November 04, 2013
Pandora's Promise; NRC docs for Browns Ferry 10/12 - 11/2/13; 2013 Krispy Kreme Challenge
- ML13291A007 - Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2 and Watts Bar, Unit 1 - 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance #9168 - Cask 8-120B.
- ML13284A084 - Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302.
- ML13297A124 - Radioactive Emissions and Health Hazards Surrounding Browns Ferry Nuclear Power Plant in Alabama.
- ML13297A263 - ER 05000259/13-302, 05000260/13-302, and 05000296/13-302; Operating Retake Test September 25-26, 2013, Browns Ferry Nuclear Plant, Operator License Examination.
- ML13296A022 - Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Registration of Use of Cask to Store Spent Fuel.
- ML13291A384 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Inservice Testing Program for the Fourth Ten Year Interval.
- ML13233A183 - Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant.
If you're interested, join me in running at the 2013 Krispy Kreme Challenge to benefit UCP.
Tuesday, October 15, 2013
Slackin' - NRC docs dated between 9/21 and 10/12/2013 for Browns Ferry; Time for eggnog; Care to donate to our Liz Hurley Ribbon Run team?
- ML13260A014 - Tennessee Valley Authority's Fleet Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year...
- ML13263A013 - LER 13-004-00 for Brown Ferry, Unit 1, Regarding High Pressure Coolant Injection System Declared Inoperable Due to Exceeding the Allotted Time Frame for Instrument Inoperability.
- ML13273A014 - Browns Ferry Nuclear Plant, Units 1, 2 and 3, 10 CFR Part 21 Interim Report - Engine Systems, Inc., Relay Contact A4X-A4Y.
- ML13268A421 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Updated Reply to Notice of Violation; EA-1 1-252; and Follow-up to 10 CFR 50.9, "Completeness and Accuracy of Information," Notification.
- ML13241A461 - IR 05000259-13-201, 05000260-13-201, and 05000296-13-201, 8/16/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - NRC Security Inspection Report (Cover Letter).
- ML13273A268 - LER 09-004-01 for Browns Ferry Nuclear Plant, Unit 1, Regarding High Pressure Core Injection Found Inoperable During Compensate Header Level Switch Calibration and Functional Test.
- ML13273A267 - LER 09-002-01 for Brown Ferry Nuclear Plant, Unit 1, Regarding Unexpected Logic Lockout of the Loop II Residual Heat Removal System Pumps.
- ML13280A276 - IR 05000259, -260, -296/2013-009; 08/05/2013 - 08/23/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Post Approval Site Inspection for License Renewal.
- ML13274A340 - LER 09-006-001 for Brown Ferry, Unit 1 Regarding Inoperable High Pressure Coolant Injection Pump due to Emergency Core Cooling System Inverter Failure.
- ML13275A140 - LER 11-003-02 for Brown Ferry Plant Units 1, 2, and 3 Regarding Loss of Safety Function (SDC) Resulting from Emergency Diesel Generator Output Breaker Trip.
- ML13275A139 - LER 10-003-03 for Brown Ferry Nuclear Plant, Unit 1 Regarding Failure of a Low Pressure Coolant Injection Flow Control Valve.
- ML13275A141 - LER 10-004-02 for Browns Ferry Nuclear Plant, Unit 1, "Residual Heat Removal System Pump Motor Failure".
- ML13276A065 - ANP-3144(NP), Revision 0, "Nuclear Fuel Design Report BFE2-19 LAR ATRIUM 10XM," Enclosure 6.
- ML13276A066 - ANP-3153(NP), Revision 0, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limit for ATRIUM TM 1OXM Fuel," Enclosure 8.
- ML13276A063 - Browns Ferry, Units 1, 2 and 3 - Response to Request for Additional Information on Technical Specification Change TS-478.
- ML13276A064 - ANP-3248NP, Revision 1, "AREVA RAI Responses for Browns Ferry ATRIUM 10XM Fuel Transition," Enclosure 3.
'Tis the season...
I just finished my normal shopping trip prior to working the night shift. Lo and behold, it's baaaaack!!!
Post by Arthur Metcalf.
Saturday, September 21, 2013
NRC docs regarding Browns Ferry placed into ADAMS for the week of 9/14/13 - 9/21/13
- ML13254A081 - Browns Ferry Nuclear Plant, Unit 1 - Issuance of Amendment Under Exigent Circumstances to Remove Notes From Technical Specifications 3.4.9-1 and 3.4.9-2 (TAC No. MF2564).
- ML13252A037 - Bellefonte, Units 1 & 2, Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2 and Watts Bar, Units 1 & 2, Submittal of Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A.
- ML13252A338 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13256A101 - Browns Ferry, Units 1, 2, and 3, 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation.
- ML13260A077 - Browns Ferry Nuclear Plant, Unit 3 - 10 CFR Part 21 Interim Report - General Electric (GE) Hitachi Nuclear Energy - SBM Type Manual Switch.
- ML13253A139 - Browns Ferry Nuclear Plant, Unit 2, American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner's Activity Report for Cycle 17 Operation.
- ML13253A075 - Tennessee Valley Authority - Organization Topical Report, TVA-NPOD89-A.
- ML13256A379 - 2013/09/03 NRR E-mail Capture - Browns Ferry Unit Exigent amendment additional RAI
- ML13256A388 - 2013/09/13 NRR E-mail Capture - BROWNS FERRY NUCLEAR PLANT, UNIT 1: Issuance of an exigent amendment regarding removing Notes on Browns Ferry Unit 1 Technical specification Figures 3.4.9-1 and 3.4.9-2
Monday, September 16, 2013
TomorrowWorld and NRC docs for Browns Ferry 9/7/13 - 9/14/13
September 27 - 29, a HUGE modern dance music festival will converge on Chattahoochee Hills, GA. This video (courtesy of the TomorrowWorld Facebook page) can be considered a sample of what will transpire.
I CAN'T WAIT!!!
Post by Tomorrowworld.
I CAN'T WAIT!!!
- ML13233A128 - EN-13-029, Issuance of Final Significance Determination and Notice of Violation, Browns Ferry (EA-13-118).
- ML13239A248 - Browns Ferry, Units 1, 2 & 3, Submittal of Revised Evacuation Time Estimates.
- ML13239A250 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 2 of 2.
- ML13239A249 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 1 of 2.
- ML13247A284 - Browns Ferry Nuclear Plant, Units 1, 2, & 3 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049).
- ML13247A290 - First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant.
- ML13254A051 - Browns Ferry Nuclear Station Units 1, 2, and 3 Notification of Inspection and Request for Information.
- ML13254A345 - IR 05000259-13-10, 05000260-13-10, 05000296-13-10,on 01/31/2013, Browns Ferry Nuclear Plant - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.
Sunday, September 08, 2013
Here are the documents NRC placed into ADAMS regarding Browns Ferry Nuclear Plant last week
- ML13235A308 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request Under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13224A088 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - RAI for Technical Specification Change TS-478 Re. Additional Analytical Methodologies to TS 5.6.5 for BFN Units 1. 2, and 3 and Revision of TS2.1.1.2 for BFN Unit 2 FOL (TAC Nos. MF0877-0879).
- ML13232A392 - 2013/08/16 NRR E-mail Capture - Browns Ferry, Unit 1 Exigent Amendment - Administrative Changes to Remove the Notes on TS Figures 3.4.9-1 and 3.4.9-2 (P-T Curves) (TAC No. MF2564) - Request for Additional Information (RAI)
- ML13227A255 - Browns Ferry Nuclear Plant, Unit 1, Individual FR Notice of Appliaction and Amendment to Facility Operating License (TAC MF2564).
- ML13233A360 - 2013/08/20 NRR E-mail Capture - Re: BROWNS FERRY UNITS 1, 2 AND 3: ISSUANCE OF AMENDS RE: DELETION OF REFERENCES TO ASME CODE SECTION XI AND INCORP OF REFS TO THE ASME OPER AND MAINT CODE, AND EXT OF SURVEILLANCE INTERVALS T...
- ML13246A184 - Browns Ferry 2013 Mid Cycle Assessment Letter.
- ML13199A221 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals.
- ML13246A087 - Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification.
- ML13232A189 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Branch Chief Reassignment for Plant Licensing Branch II-2.
- ML13249A273 - Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation's Nuclear Plants.
Saturday, August 31, 2013
NRC docs for Browns Ferry 8/24/13 - 8/31/13
- ML13235A271 - Press Release-II-13-053: NRC Issues Confirmatory Action Letter to Browns Ferry Nuclear Plant.
- ML13234A539 - IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report.
- ML13238A132 - Press Release-II-13-054: NRC Finalizes White Finding and Issues Violation at Browns Ferry Nuclear Power Plant.
- ML13240A372 - Press Release-II-13-055: NRC Assigns Senior Resident Inspector to Nuclear Fuel Services In Erwin, Tenn.
- ML13233A364 - Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049.
- ML13234A503 - Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049.
- ML13231A085 - 2013/08/16 NRR E-mail Capture - RE: Browns Ferry, Unit 1 Exigent Amendment - Administrative Changes to Remove the Notes on TS Figures 3.4.9-1 and 3.4.9-2 (P-T Curves) (TAC No. MF2564) - Acceptance Review
Saturday, August 24, 2013
No double moon Aug 27; Weekly NRC docs; 4.5 mile run on 8/24/13
- ML112370111 - Browns Ferry, Initial Exam 2011-302 Final SRO Written Exam.
- ML112790089 - Browns Ferry Initial Exam 2011-302 Draft SRO Written Exam.
- ML112370110 - Browns Ferry Initial Exam 2011-302 Final RO Written Exam.
- ML112790087 - Browns Ferry Initial Exam 2011-302 Draft RO Written Exam.
- ML13227A253 - Browns Ferry Nuclear Plant, Unit 1, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity of a Hearing (TAC NO. MF2564).
- ML13228A399 - Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - RIN 3150-AI64 [NRC-2009-0163] EA-02-109.
- ML13231A230 - IR 05000259-13-302, 05000260-13-302, 05000296-13-302, Browns Ferry Nuclear Plant - Notification of Licensed Operator Retake Initial Examination.
- ML13227A353 - Transmittal of Technical Report 3002000078, "BWRVIP-271NP: BWR Vessel & Internals Project Testing and Evaluation of the Browns Ferry Unit 2 120 Degrees Capsule".
- ML13227A103 - Browns Ferry, Unit 1 - License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13232A105 - Confirmatory Action Letter - Browns Ferry Nuclear Plant, Units 1, 2, And 3, Commitments Related To The Integrated Improvement Plan.
- ML13235A058 - IR 05000260-13-013, and Notice of Violation, 05/14/2013, Browns Ferry Nuclear Plant, Final Significance Determination of White Finding.
Slight word of warning, I uttered a strong expletive in the second video in this playlist (i.e. NSFW/NSFK) because I wasn't pleased with the woman on the cell phone who was bound and determined to pull out of the Chevron around the corner (and pull into me)
By the way, here are the six videos from the 2013 Drenched Huntsville:
Friday, August 23, 2013
Sunday, August 18, 2013
NRC docs in ADAMS for 8/10 - 8/17/13 and Run Drenched
- ML13064A465 - Browns Ferry - Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049).
- ML13225A293 - 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop.
- ML13224A263 - TVA, Commitments Related to the Browns Ferry Integrated Improvement Plan.
- ML13220A102 - The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project Plan - July 2013 Status Report.
- ML13226A550 - IR 05000259-13-003, 05000260-13-003, 05000296-13-003; 04/01/2013 - 06/30/2013; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Equipment Operability Evaluations and Follow-up of Events.
- ML13225A557 - Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit.
Sunday, August 11, 2013
Docs in ADAMS for 8/3/13 - 8/10/13 (plenty of prior testing stuff)
- ML13161A286 - Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations.
- ML13211A316 - LER 11-009-03 for Browns Ferry, Units 1 and 2, Regarding As-Found Undervoltage Trip for the Reactor Protection System 1A1 Relay that Did Not Meet Acceptance Criteria During Several Surveillance.
- ML13214A243 - Browns Ferry Initial Exam 2013-301 General Correspondence.
- ML13214A259 - Browns Ferry Initial Exam 2013-301 Final Administrative JPMs.
- ML13214A324 - Browns Ferry Initial Exam 2013-301 Draft Sim IN-Plant JPMs.
- ML13214A266 - Browns Ferry Initial Exam 2013-301 Final Sim IN-Plant JPMs.
- ML13214A271 - Browns Ferry Initial Exam 2013-301 Final Administrative Documents.
- ML13214A323 - Browns Ferry Initial Exam 2013-301 Draft Administrative JPMs.
- ML13214A325 - Browns Ferry Initial Exam 2013-301 Draft Simulator Scenarios.
- ML13214A269 - Browns Ferry Initial Exam 2013-301 Final Simulator Scenarios.
- ML13214A337 - Browns Ferry Initial Exam 2013-301 Draft Administrative Documents.
Friday, August 02, 2013
NRC documents regarding Browns Ferry placed into ADAMS for 7/20 - 8/3/13
- ML13193A017 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Response to NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations.
- ML13199A452 - 07/11/2013 Summary of Meeting with Browns Ferry.
- ML13199A148 - IR 05000259-13-405, 05000260-13-405 and 05000296-13-405, Browns Ferry, Special Inspection - Cover Letter.
- ML13204A094 - Submittal of Reference Documents Related to EA-13-0118 for Browns Ferry Nuclear Plant Unit 2.
- ML13182A396 - Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and watts Bar Nuclear Plant - Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 (TAC NOS. MF0902, MF0903, MF0904, MF0864, MF0865, MF0950, and MF1177).
- ML13141A291 - Browns Ferry, Units 1, 2 & 3 - Response to NRC Request to Supplement License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.
- ML13205A410 - ER 05000259/13-301, 05000260/13-301 and 05000296/13-301, Operating Test June 3-7, 2013, & Written Exam June 28, 2013, Browns Ferry Nuclear Plant, Operator License Examinations, Units 1, 2, and 3.
- ML13210A179 - NUREG/KM-0002, "The Browns Ferry Nuclear Plant Fire of 1975 Knowledge Management Digest."
- ML13126A252 - Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2, Watts Bar, Unit 1, Request for Additional Information on the 2013 Decommissioning Funding Status Report (TAC MF1209, MF1210, MF1211, MF1288, MF1290, MF1305).
- ML13206A005 - Browns Ferry, Units 1, 2, and 3, Response to NRC Request for Additional Information Regarding Overall Integrated Plan in Response to the Commission Order Modifying Licenses With Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.
- ML13212A084 - 07/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260/20132012.
- ML13206A427 - Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents.
Monday, July 22, 2013
Balloons and a bunny and NRC docs in ADAMS regarding Browns Ferry for the week of 7/13 - 7/20/13
- ML110980772 - Browns Ferry Initial Exam 2011-301 Draft Sim/IN-Plant JPMs.
- ML110760683 - Browns Ferry Initial Exam 2011-301 Final RO Written Exam with References.
- ML111010593 - Browns Ferry Initial Exam 2011-301 Final RO-SRO Written Exam Working copy.
- ML111010368 - Browns Ferry Initial Exam 2011-301 Draft Administrative JPMs.
- ML110980764 - Browns Ferry Initial Exam 2011-301 Draft SRO Written Exam.
- ML111010606 - Browns Ferry Initial Exam 2011-301 Final Simulator Scenarios.
- ML110980768 - Browns Ferry Initial Exam 2011-301 Draft Simulator Scenarios.
- ML110980758 - Browns Ferry Initial Exam 2011-301 Draft RO Written Exam.
- ML111020054 - Browns Ferry Initial Exam 2011-301 General Correspondence.
- ML110980756 - Browns Ferry Initial Exam 2011-301 Draft Administrative Documents.
- ML111010548 - Browns Ferry Initial Exam 2011-301 Final Administrative Documents.
- ML110760682 - Browns Ferry Initial Exam 2011-301 Final SRO Written Exam with References.
- ML111020053 - Browns Ferry Initial Exam 2011-301 Final Administrative JPMs.
- ML111010634 - Browns Ferry Initial Exam 2011-301 Final Sim-IN Plant JPMs.
- ML13189A133 - Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Barr, Units 1, Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project Plan.
- ML13191A882 - Browns Ferry Initial 2013-301 Reactor Operator and Senior Reactor Operator Initial License Written Examinations - Post Examination Response.
- ML111300255 - Browns Ferry 2011301 Security Agreement.
- ML12318A362 - Browns Ferry Initial Exam 2012-301 Final Simulator Scenarios.
- ML12318A359 - Browns Ferry Initial Exam 2012-301 Final Sim IN-Plant JPMs.
- ML12318A357 - Browns Ferry Initial Exam 2012-301 Draft Administrative Documents.
- ML12331A316 - Browns Ferry Initial Exam 2012-301 Draft Sim IN-Plant JPMs.
- ML12331A314 - Browns Ferry Initial Exam 2012-301 Final Administrative JPMs.
- ML13197A384 - Press Release-II-13-048: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Browns Ferry Nuclear Plant.
- ML13172A002 - Browns Ferry Nuclear Plant, Unit 3 - Transmittal of Final Accident Sequence Precursor (ASP) Analysis.
- ML13177A352 - Browns Ferry Nuclear Plant Review of Commitment Submittal for License Renewal Regarding the One-Time Inspection Procedure (TAC ME7797, ME7798, AND ME7799).
Sunday, July 14, 2013
NRC docs for Browns Ferry for 7/6/13 - 7/13/13; Synth1/presets
- ML13178A282 - Browns Ferry, Units 1, 2 and 3 - Answer to June 6, 2013 Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109).
- ML13183A189 - Aerial Radiological Survey of the Brown Ferry Nuclear Power Station - 1985.
- ML13191A172 - 07/24/2013 Notice of Category 1 Meeting - Regulatory Conference Browns Ferry.
- ML13183A058 - Browns Ferry Nuclear Plant, Unit 2, Tennessee Valley Authority - Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant, Unit 2 Seismic Walkdown.
- ML13191A893 - 2012 Browns Ferry Annual Assessment Meeting Slides.
- ML13191A898 - Browns Ferry 95003 Part 3 Public Exit Meeting.
- ML13190A487 - June 2013 - Browns Ferry NRC Generic Fundamentals Examination Results Letter.
I enjoy playing around with Synth1. If you're interested in creating music, give it a look. In conjunction with Synth1, I use several other VST instruments/effects. I ran across some recent presets for Synth1 today. Pretty decent...
Saturday, July 06, 2013
NRC docs in ADAMS for Browns Ferry 6/29 - 7/6/13; Rain, rain, go away...
- ML13178A125 - IR 05000259, 05000260, 05000296-13-503, on 06/03/2013, 06/07/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection.
- ML13179A141 - Browns Ferry - Operator Licensing Written Examination Approval 05000259-13-301, 05000260-13-301 AND 05000296-13-301.
- ML13183A212 - Press Release-II-13-046: NRC Schedules Public Meeting to Discuss Browns Ferry Nuclear Plant.
Rain, rain, go away...
Thursday, July 04, 2013
Monday, July 01, 2013
NRC docs for Browns Ferry - week of 6/22 - 6/29/13
- ML13169A246 - LER 13-001-01 for Browns Ferry Nuclear Plant, Unit 1, Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis.
- ML13157A150 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Staff Assessment of Licensee's Response to Information Request Pursuant to 10 CFR 50.54(f) Letter - Recommendation 9.3, Communications (TAC NOS. ME9993, ME9994, and ME9995).
- ML13177A443 - IR 05000259-13-007, 05000260-13-007, 05000296-13-007, 05000259-13-404, 05000260-13-404, 05000296-13-404; TNV; 01/28/2013 - 02/28/2013; Browns Ferry Plant Units 1, 2, and 3, Component Design Bases Inspection Report.
- ML13178A353 - 07/11/2013 Notice of Meeting With Tennessee Valley Authority to Discuss The Annual Assessment & Inspection Procedure 95003 Supplemental Inspection for Browns Ferry Nuclear Plant.
Subscribe to:
Posts (Atom)