Tuesday, December 17, 2013

That Metal Show; Lakes on Titan; 20,000 species near extinction? Kinda scary!; Posole; Interesting Depeche Mode covers

All I've got to say is new episodes of That Metal Show




Check out this cool video of the liquid surface features on Titan


Embedded video from
NASA Jet Propulsion Laboratory California Institute of Technology


20,000 Species Are Near Extinction: Is it Time to Rethink How We Decide What to Save?


Tasty looking dish - Posole




Back in the day, I guess you could say I was a definite fan of DM. I still enjoy them quite a bit. This cover artist from Colombia does a pretty good reinterpretation of some of their music. Better than that, his kids are all a part of the fun!

Post by DMK.

Saturday, December 14, 2013

NRC docs for Browns Ferry 12/7 - 12/14/13; My 2nd amendment exercise; You'd better get your license to join in capitalism

  1. ML13333A164 - LER 13-002-00 for Browns Ferry, Unit 2 Regarding High Pressure Coolant Injection System Declared Inoperable Due to an Unqualified Electrical Splice.
  2. ML13340A382 - Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters.
  3. ML13309A080 - Memorandum to File: Transcript for 10 CFR 2.206 Petition From Beyond Nuclear (et al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors (TAC No. MF1176).
  4. ML13309A230 - Transcript of 10 CFR Petition Review Board Re[Garding] General Electric Mark I and II [Boiling Water Reactors] BWRs, 09-30-2013, Pages 1-98[100].
  5. ML13339A333 - Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Task...
  6. ML13345A613 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Registration of Use of Cask to Store Spent Fuel.






Thursday, December 12, 2013

Diets through time; My choice (come out and play volleyball today at 4 PM)




Speaking for myself, I'll choose volleyball and a bit of running today. Other days it's kayaking, biking, or something else...

Saturday, November 23, 2013

Come join the fun at Race for the Fallen

Race for the Fallen 5K; NRC docs for Browns Ferry 11/16 - 11/23/13

Race for the Fallen 5K - Florence, AL - 11/23/13 - 7 PM




  1. ML13312A884 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Branch Chief Reassignment for Plant Licensing Branch II-2.
  2. ML13318A082 - IR 05000259-13-004, 05000260-13-004, & 05000296-13-004, July 1, 2013, through September 30, 2013, Browns Ferry, Integrated Inspection Report and Exercise of Enforcement Discretion.
  3. ML13298A702 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - RAI Regarding LAR to Request Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (TAC Nos. MF1185 - MF1187).

Wednesday, November 20, 2013

Just one example of misunderstanding in the BEST/MATRR "report"

The BEST/MATRR report

In Section II. HEALTH HAZARDS POSED BY REACTOR MELTDOWNS - B. Estimates of Casualties (p. 15 of the pdf file), the authors cite casualty estimates based on a Sandia National Laboratories report entitled Technical Guidance for Siting Criteria Development/ (aka CRAC-2). A group named Riverkeeper tried to use the CRAC-2 report as a partial justification to impede the operation of the Indian Point nuclear plant via a 10 CFR 2.206 petition. The following is what Samuel J. Collins (the former Director of the Office of Nuclear Reactor Regulation of the NRC from 1997 to 2003) had to say in denying the Riverkeeper petition (pages 25-26 of the pdf and pages 12-13 of the decision):

"The Petitioners refer to the 1982 Sandia National Laboratory (SNL) Report, “Calculation of Reactor Accident Consequences” (CRAC-2 Report), and cite this report as a basis for concern that a terrorist attack could result in a massive release of radioactive materials. The reactor siting studies in the CRAC-2 Report were performed as part of research on the sensitivity of various plant siting parameters. The studies used generic postulated releases of radioactivity from a spectrum of severe (core melt) accidents, independent of the probabilities of the event occurring or the impact of mitigation mechanisms. The studies were never intended to be realistic assessments of accident consequences. The estimated deaths and injuries resulted from assuming the most adverse condition for each parameter in the analytical code. In the cited studies, the number of resulting deaths and injuries also reflected the assumption that no protective actions were taken for the first 24 hours. The studies did not, and were never intended to, reflect reality or serve as a basis for emergency planning. The CRAC-2 Report analyses used more simplistic models than current technologies. The two basic conclusions from the SNL siting studies were that the mean estimated number of health effects from the assumed releases for all reactor sites varied by up to more than 4 orders of magnitude and that the financial costs of the releases were dominated by clean-up costs and replacement power costs. The SNL studies provided a useful measure to compare sites, not to analyze plant-specific accident consequences."

A more modern tool/study by the NRC is the State-of-the-Art Reactor Consequence Analyses (SOARCA).

Tuesday, November 19, 2013

WAFF is touting a report that talks about Browns Ferry and radiological hazards posed to North Alabama

They're supposed to do a report on Thursday. The commercials they are running almost make it sound like they have exclusive access to this piece. If I'm right about what they are talking about, they don't. The report was created by several anti-nuclear concerns in North Alabama (and elsewhere) and published by a small local publishing company. I have my own opinions regarding the report, but you can draw your own.

2013 Krispy Kreme Challenge results; NRC docs about Browns Ferry for 11/9/13 - 11/16/13; We Run Huntsville




  1. ML13309A747 - The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report.
  2. ML082401219 - NRC Bulletin 96-003, "Potential Plugging of ECCS Strainers by Debris in BWRs."
  3. ML082490807 - NRC Bulletin 95-002, "Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode."
  4. ML13274A657 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Interim Staff Evaluations and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NOS. MF0881, MF0882, and MF0883).



For a LOT of pictures from the Dizzy 50 and the 2013 Krispy Krreme Challenge, visit http://werunhuntsville.smugmug.com/Other-1/2013-Dizzy-50/i-B9dd89r! The individual responsible for the pictures does a great job and covers many Huntsville races. Here's me right before the finish line:

Tuesday, October 15, 2013

Slackin' - NRC docs dated between 9/21 and 10/12/2013 for Browns Ferry; Time for eggnog; Care to donate to our Liz Hurley Ribbon Run team?

  1. ML13260A014 - Tennessee Valley Authority's Fleet Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year...
  2. ML13263A013 - LER 13-004-00 for Brown Ferry, Unit 1, Regarding High Pressure Coolant Injection System Declared Inoperable Due to Exceeding the Allotted Time Frame for Instrument Inoperability.
  3. ML13273A014 - Browns Ferry Nuclear Plant, Units 1, 2 and 3, 10 CFR Part 21 Interim Report - Engine Systems, Inc., Relay Contact A4X-A4Y.
  4. ML13268A421 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Updated Reply to Notice of Violation; EA-1 1-252; and Follow-up to 10 CFR 50.9, "Completeness and Accuracy of Information," Notification.
  5. ML13241A461 - IR 05000259-13-201, 05000260-13-201, and 05000296-13-201, 8/16/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - NRC Security Inspection Report (Cover Letter).
  6. ML13273A268 - LER 09-004-01 for Browns Ferry Nuclear Plant, Unit 1, Regarding High Pressure Core Injection Found Inoperable During Compensate Header Level Switch Calibration and Functional Test.
  7. ML13273A267 - LER 09-002-01 for Brown Ferry Nuclear Plant, Unit 1, Regarding Unexpected Logic Lockout of the Loop II Residual Heat Removal System Pumps.
  8. ML13280A276 - IR 05000259, -260, -296/2013-009; 08/05/2013 - 08/23/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Post Approval Site Inspection for License Renewal.
  9. ML13274A340 - LER 09-006-001 for Brown Ferry, Unit 1 Regarding Inoperable High Pressure Coolant Injection Pump due to Emergency Core Cooling System Inverter Failure.
  10. ML13275A140 - LER 11-003-02 for Brown Ferry Plant Units 1, 2, and 3 Regarding Loss of Safety Function (SDC) Resulting from Emergency Diesel Generator Output Breaker Trip.
  11. ML13275A139 - LER 10-003-03 for Brown Ferry Nuclear Plant, Unit 1 Regarding Failure of a Low Pressure Coolant Injection Flow Control Valve.
  12. ML13275A141 - LER 10-004-02 for Browns Ferry Nuclear Plant, Unit 1, "Residual Heat Removal System Pump Motor Failure".
  13. ML13276A065 - ANP-3144(NP), Revision 0, "Nuclear Fuel Design Report BFE2-19 LAR ATRIUM 10XM," Enclosure 6.
  14. ML13276A066 - ANP-3153(NP), Revision 0, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limit for ATRIUM TM 1OXM Fuel," Enclosure 8.
  15. ML13276A063 - Browns Ferry, Units 1, 2 and 3 - Response to Request for Additional Information on Technical Specification Change TS-478.
  16. ML13276A064 - ANP-3248NP, Revision 1, "AREVA RAI Responses for Browns Ferry ATRIUM 10XM Fuel Transition," Enclosure 3.



'Tis the season...

I just finished my normal shopping trip prior to working the night shift. Lo and behold, it's baaaaack!!!



Saturday, September 21, 2013

NRC docs regarding Browns Ferry placed into ADAMS for the week of 9/14/13 - 9/21/13

  1. ML13254A081 - Browns Ferry Nuclear Plant, Unit 1 - Issuance of Amendment Under Exigent Circumstances to Remove Notes From Technical Specifications 3.4.9-1 and 3.4.9-2 (TAC No. MF2564).
  2. ML13252A037 - Bellefonte, Units 1 & 2, Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2 and Watts Bar, Units 1 & 2, Submittal of Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A.
  3. ML13252A338 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
  4. ML13256A101 - Browns Ferry, Units 1, 2, and 3, 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation.
  5. ML13260A077 - Browns Ferry Nuclear Plant, Unit 3 - 10 CFR Part 21 Interim Report - General Electric (GE) Hitachi Nuclear Energy - SBM Type Manual Switch.
  6. ML13253A139 - Browns Ferry Nuclear Plant, Unit 2, American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner's Activity Report for Cycle 17 Operation.
  7. ML13253A075 - Tennessee Valley Authority - Organization Topical Report, TVA-NPOD89-A.
  8. ML13256A379 - 2013/09/03 NRR E-mail Capture - Browns Ferry Unit Exigent amendment additional RAI
  9. ML13256A388 - 2013/09/13 NRR E-mail Capture - BROWNS FERRY NUCLEAR PLANT, UNIT 1: Issuance of an exigent amendment regarding removing Notes on Browns Ferry Unit 1 Technical specification Figures 3.4.9-1 and 3.4.9-2

Monday, September 16, 2013

TomorrowWorld and NRC docs for Browns Ferry 9/7/13 - 9/14/13

September 27 - 29, a HUGE modern dance music festival will converge on Chattahoochee Hills, GA. This video (courtesy of the TomorrowWorld Facebook page) can be considered a sample of what will transpire.



I CAN'T WAIT!!!



  1. ML13233A128 - EN-13-029, Issuance of Final Significance Determination and Notice of Violation, Browns Ferry (EA-13-118).
  2. ML13239A248 - Browns Ferry, Units 1, 2 & 3, Submittal of Revised Evacuation Time Estimates.
  3. ML13239A250 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 2 of 2.
  4. ML13239A249 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 1 of 2.
  5. ML13247A284 - Browns Ferry Nuclear Plant, Units 1, 2, & 3 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049).
  6. ML13247A290 - First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant.
  7. ML13254A051 - Browns Ferry Nuclear Station Units 1, 2, and 3 Notification of Inspection and Request for Information.
  8. ML13254A345 - IR 05000259-13-10, 05000260-13-10, 05000296-13-10,on 01/31/2013, Browns Ferry Nuclear Plant - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.

Sunday, September 08, 2013

Here are the documents NRC placed into ADAMS regarding Browns Ferry Nuclear Plant last week

  1. ML13235A308 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request Under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
  2. ML13224A088 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - RAI for Technical Specification Change TS-478 Re. Additional Analytical Methodologies to TS 5.6.5 for BFN Units 1. 2, and 3 and Revision of TS2.1.1.2 for BFN Unit 2 FOL (TAC Nos. MF0877-0879).
  3. ML13232A392 - 2013/08/16 NRR E-mail Capture - Browns Ferry, Unit 1 Exigent Amendment - Administrative Changes to Remove the Notes on TS Figures 3.4.9-1 and 3.4.9-2 (P-T Curves) (TAC No. MF2564) - Request for Additional Information (RAI)
  4. ML13227A255 - Browns Ferry Nuclear Plant, Unit 1, Individual FR Notice of Appliaction and Amendment to Facility Operating License (TAC MF2564).
  5. ML13233A360 - 2013/08/20 NRR E-mail Capture - Re: BROWNS FERRY UNITS 1, 2 AND 3: ISSUANCE OF AMENDS RE: DELETION OF REFERENCES TO ASME CODE SECTION XI AND INCORP OF REFS TO THE ASME OPER AND MAINT CODE, AND EXT OF SURVEILLANCE INTERVALS T...
  6. ML13246A184 - Browns Ferry 2013 Mid Cycle Assessment Letter.
  7. ML13199A221 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals.
  8. ML13246A087 - Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification.
  9. ML13232A189 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Branch Chief Reassignment for Plant Licensing Branch II-2.
  10. ML13249A273 - Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation's Nuclear Plants.

Saturday, August 24, 2013

No double moon Aug 27; Weekly NRC docs; 4.5 mile run on 8/24/13




  1. ML112370111 - Browns Ferry, Initial Exam 2011-302 Final SRO Written Exam.
  2. ML112790089 - Browns Ferry Initial Exam 2011-302 Draft SRO Written Exam.
  3. ML112370110 - Browns Ferry Initial Exam 2011-302 Final RO Written Exam.
  4. ML112790087 - Browns Ferry Initial Exam 2011-302 Draft RO Written Exam.
  5. ML13227A253 - Browns Ferry Nuclear Plant, Unit 1, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity of a Hearing (TAC NO. MF2564).
  6. ML13228A399 - Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - RIN 3150-AI64 [NRC-2009-0163] EA-02-109.
  7. ML13231A230 - IR 05000259-13-302, 05000260-13-302, 05000296-13-302, Browns Ferry Nuclear Plant - Notification of Licensed Operator Retake Initial Examination.
  8. ML13227A353 - Transmittal of Technical Report 3002000078, "BWRVIP-271NP: BWR Vessel & Internals Project Testing and Evaluation of the Browns Ferry Unit 2 120 Degrees Capsule".
  9. ML13227A103 - Browns Ferry, Unit 1 - License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
  10. ML13232A105 - Confirmatory Action Letter - Browns Ferry Nuclear Plant, Units 1, 2, And 3, Commitments Related To The Integrated Improvement Plan.
  11. ML13235A058 - IR 05000260-13-013, and Notice of Violation, 05/14/2013, Browns Ferry Nuclear Plant, Final Significance Determination of White Finding.



Slight word of warning, I uttered a strong expletive in the second video in this playlist (i.e. NSFW/NSFK) because I wasn't pleased with the woman on the cell phone who was bound and determined to pull out of the Chevron around the corner (and pull into me)




By the way, here are the six videos from the 2013 Drenched Huntsville:

Run 8-23-13

Friday, August 23, 2013

Packet pickup for 8/24 Drenched at the Space & Rocket Center Marriott 1-7 PM today