The following documents regarding Browns Ferry were posted in the NRC's ADAMS system for the week of 5/18/2013 - 5/25/2013:
- ML13115A955 - Final ASP Analysis-Browns Ferry Nuclear Plant, Unit 3, Reactor Trip and Subsequent Loss of Offsite Power due Failure of Unit Station System Transformer Differential Relay (LER 296/12-004).
- ML13134A014 - LER 13-001-01, for Browns Ferry. Unit 3 Regarding Inoperable Emergency Diesel Generator Due to Failed Electric Generator Casing Fan Bearing.
- ML13142A329 - Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0.
Cotton Row 2013 10K and 5K results
10K Overall
10K By Age Groups
5K Overall
5K By Age Groups
No comments:
Post a Comment