- ML13254A081 - Browns Ferry Nuclear Plant, Unit 1 - Issuance of Amendment Under Exigent Circumstances to Remove Notes From Technical Specifications 3.4.9-1 and 3.4.9-2 (TAC No. MF2564).
- ML13252A037 - Bellefonte, Units 1 & 2, Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2 and Watts Bar, Units 1 & 2, Submittal of Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A.
- ML13252A338 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13256A101 - Browns Ferry, Units 1, 2, and 3, 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation.
- ML13260A077 - Browns Ferry Nuclear Plant, Unit 3 - 10 CFR Part 21 Interim Report - General Electric (GE) Hitachi Nuclear Energy - SBM Type Manual Switch.
- ML13253A139 - Browns Ferry Nuclear Plant, Unit 2, American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner's Activity Report for Cycle 17 Operation.
- ML13253A075 - Tennessee Valley Authority - Organization Topical Report, TVA-NPOD89-A.
- ML13256A379 - 2013/09/03 NRR E-mail Capture - Browns Ferry Unit Exigent amendment additional RAI
- ML13256A388 - 2013/09/13 NRR E-mail Capture - BROWNS FERRY NUCLEAR PLANT, UNIT 1: Issuance of an exigent amendment regarding removing Notes on Browns Ferry Unit 1 Technical specification Figures 3.4.9-1 and 3.4.9-2
Saturday, September 21, 2013
NRC docs regarding Browns Ferry placed into ADAMS for the week of 9/14/13 - 9/21/13
Monday, September 16, 2013
TomorrowWorld and NRC docs for Browns Ferry 9/7/13 - 9/14/13
September 27 - 29, a HUGE modern dance music festival will converge on Chattahoochee Hills, GA. This video (courtesy of the TomorrowWorld Facebook page) can be considered a sample of what will transpire.
I CAN'T WAIT!!!
Post by Tomorrowworld.
I CAN'T WAIT!!!
- ML13233A128 - EN-13-029, Issuance of Final Significance Determination and Notice of Violation, Browns Ferry (EA-13-118).
- ML13239A248 - Browns Ferry, Units 1, 2 & 3, Submittal of Revised Evacuation Time Estimates.
- ML13239A250 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 2 of 2.
- ML13239A249 - Browns Ferry, Units 1, 2 & 3, Enclosure 1, 2 & 3 - Comments & Responses to NRC Comments on TVA 2012 ETE Submittals and ETEs for Plant Plume Exposure Pathway Emergency Planning Zone. Part 1 of 2.
- ML13247A284 - Browns Ferry Nuclear Plant, Units 1, 2, & 3 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049).
- ML13247A290 - First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant.
- ML13254A051 - Browns Ferry Nuclear Station Units 1, 2, and 3 Notification of Inspection and Request for Information.
- ML13254A345 - IR 05000259-13-10, 05000260-13-10, 05000296-13-10,on 01/31/2013, Browns Ferry Nuclear Plant - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.
Sunday, September 08, 2013
Here are the documents NRC placed into ADAMS regarding Browns Ferry Nuclear Plant last week
- ML13235A308 - Tennessee Valley Authority Response to Request for Additional Information Regarding License Amendment Request Under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13224A088 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - RAI for Technical Specification Change TS-478 Re. Additional Analytical Methodologies to TS 5.6.5 for BFN Units 1. 2, and 3 and Revision of TS2.1.1.2 for BFN Unit 2 FOL (TAC Nos. MF0877-0879).
- ML13232A392 - 2013/08/16 NRR E-mail Capture - Browns Ferry, Unit 1 Exigent Amendment - Administrative Changes to Remove the Notes on TS Figures 3.4.9-1 and 3.4.9-2 (P-T Curves) (TAC No. MF2564) - Request for Additional Information (RAI)
- ML13227A255 - Browns Ferry Nuclear Plant, Unit 1, Individual FR Notice of Appliaction and Amendment to Facility Operating License (TAC MF2564).
- ML13233A360 - 2013/08/20 NRR E-mail Capture - Re: BROWNS FERRY UNITS 1, 2 AND 3: ISSUANCE OF AMENDS RE: DELETION OF REFERENCES TO ASME CODE SECTION XI AND INCORP OF REFS TO THE ASME OPER AND MAINT CODE, AND EXT OF SURVEILLANCE INTERVALS T...
- ML13246A184 - Browns Ferry 2013 Mid Cycle Assessment Letter.
- ML13199A221 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals.
- ML13246A087 - Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification.
- ML13232A189 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Branch Chief Reassignment for Plant Licensing Branch II-2.
- ML13249A273 - Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation's Nuclear Plants.
Saturday, August 31, 2013
NRC docs for Browns Ferry 8/24/13 - 8/31/13
- ML13235A271 - Press Release-II-13-053: NRC Issues Confirmatory Action Letter to Browns Ferry Nuclear Plant.
- ML13234A539 - IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report.
- ML13238A132 - Press Release-II-13-054: NRC Finalizes White Finding and Issues Violation at Browns Ferry Nuclear Power Plant.
- ML13240A372 - Press Release-II-13-055: NRC Assigns Senior Resident Inspector to Nuclear Fuel Services In Erwin, Tenn.
- ML13233A364 - Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049.
- ML13234A503 - Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049.
- ML13231A085 - 2013/08/16 NRR E-mail Capture - RE: Browns Ferry, Unit 1 Exigent Amendment - Administrative Changes to Remove the Notes on TS Figures 3.4.9-1 and 3.4.9-2 (P-T Curves) (TAC No. MF2564) - Acceptance Review
Saturday, August 24, 2013
No double moon Aug 27; Weekly NRC docs; 4.5 mile run on 8/24/13
- ML112370111 - Browns Ferry, Initial Exam 2011-302 Final SRO Written Exam.
- ML112790089 - Browns Ferry Initial Exam 2011-302 Draft SRO Written Exam.
- ML112370110 - Browns Ferry Initial Exam 2011-302 Final RO Written Exam.
- ML112790087 - Browns Ferry Initial Exam 2011-302 Draft RO Written Exam.
- ML13227A253 - Browns Ferry Nuclear Plant, Unit 1, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity of a Hearing (TAC NO. MF2564).
- ML13228A399 - Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - RIN 3150-AI64 [NRC-2009-0163] EA-02-109.
- ML13231A230 - IR 05000259-13-302, 05000260-13-302, 05000296-13-302, Browns Ferry Nuclear Plant - Notification of Licensed Operator Retake Initial Examination.
- ML13227A353 - Transmittal of Technical Report 3002000078, "BWRVIP-271NP: BWR Vessel & Internals Project Testing and Evaluation of the Browns Ferry Unit 2 120 Degrees Capsule".
- ML13227A103 - Browns Ferry, Unit 1 - License Amendment Request under Exigent Circumstances for the Administrative Change to Remove the Notes on Technical Specification Figures 3.4.9-1 and 3.4.9-2.
- ML13232A105 - Confirmatory Action Letter - Browns Ferry Nuclear Plant, Units 1, 2, And 3, Commitments Related To The Integrated Improvement Plan.
- ML13235A058 - IR 05000260-13-013, and Notice of Violation, 05/14/2013, Browns Ferry Nuclear Plant, Final Significance Determination of White Finding.
Slight word of warning, I uttered a strong expletive in the second video in this playlist (i.e. NSFW/NSFK) because I wasn't pleased with the woman on the cell phone who was bound and determined to pull out of the Chevron around the corner (and pull into me)
By the way, here are the six videos from the 2013 Drenched Huntsville:
Friday, August 23, 2013
Sunday, August 18, 2013
NRC docs in ADAMS for 8/10 - 8/17/13 and Run Drenched
- ML13064A465 - Browns Ferry - Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049).
- ML13225A293 - 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop.
- ML13224A263 - TVA, Commitments Related to the Browns Ferry Integrated Improvement Plan.
- ML13220A102 - The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project Plan - July 2013 Status Report.
- ML13226A550 - IR 05000259-13-003, 05000260-13-003, 05000296-13-003; 04/01/2013 - 06/30/2013; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Equipment Operability Evaluations and Follow-up of Events.
- ML13225A557 - Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit.
Sunday, August 11, 2013
Docs in ADAMS for 8/3/13 - 8/10/13 (plenty of prior testing stuff)
- ML13161A286 - Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations.
- ML13211A316 - LER 11-009-03 for Browns Ferry, Units 1 and 2, Regarding As-Found Undervoltage Trip for the Reactor Protection System 1A1 Relay that Did Not Meet Acceptance Criteria During Several Surveillance.
- ML13214A243 - Browns Ferry Initial Exam 2013-301 General Correspondence.
- ML13214A259 - Browns Ferry Initial Exam 2013-301 Final Administrative JPMs.
- ML13214A324 - Browns Ferry Initial Exam 2013-301 Draft Sim IN-Plant JPMs.
- ML13214A266 - Browns Ferry Initial Exam 2013-301 Final Sim IN-Plant JPMs.
- ML13214A271 - Browns Ferry Initial Exam 2013-301 Final Administrative Documents.
- ML13214A323 - Browns Ferry Initial Exam 2013-301 Draft Administrative JPMs.
- ML13214A325 - Browns Ferry Initial Exam 2013-301 Draft Simulator Scenarios.
- ML13214A269 - Browns Ferry Initial Exam 2013-301 Final Simulator Scenarios.
- ML13214A337 - Browns Ferry Initial Exam 2013-301 Draft Administrative Documents.
Friday, August 02, 2013
NRC documents regarding Browns Ferry placed into ADAMS for 7/20 - 8/3/13
- ML13193A017 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Response to NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations.
- ML13199A452 - 07/11/2013 Summary of Meeting with Browns Ferry.
- ML13199A148 - IR 05000259-13-405, 05000260-13-405 and 05000296-13-405, Browns Ferry, Special Inspection - Cover Letter.
- ML13204A094 - Submittal of Reference Documents Related to EA-13-0118 for Browns Ferry Nuclear Plant Unit 2.
- ML13182A396 - Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and watts Bar Nuclear Plant - Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 (TAC NOS. MF0902, MF0903, MF0904, MF0864, MF0865, MF0950, and MF1177).
- ML13141A291 - Browns Ferry, Units 1, 2 & 3 - Response to NRC Request to Supplement License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.
- ML13205A410 - ER 05000259/13-301, 05000260/13-301 and 05000296/13-301, Operating Test June 3-7, 2013, & Written Exam June 28, 2013, Browns Ferry Nuclear Plant, Operator License Examinations, Units 1, 2, and 3.
- ML13210A179 - NUREG/KM-0002, "The Browns Ferry Nuclear Plant Fire of 1975 Knowledge Management Digest."
- ML13126A252 - Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2, Watts Bar, Unit 1, Request for Additional Information on the 2013 Decommissioning Funding Status Report (TAC MF1209, MF1210, MF1211, MF1288, MF1290, MF1305).
- ML13206A005 - Browns Ferry, Units 1, 2, and 3, Response to NRC Request for Additional Information Regarding Overall Integrated Plan in Response to the Commission Order Modifying Licenses With Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.
- ML13212A084 - 07/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260/20132012.
- ML13206A427 - Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents.
Monday, July 22, 2013
Balloons and a bunny and NRC docs in ADAMS regarding Browns Ferry for the week of 7/13 - 7/20/13
- ML110980772 - Browns Ferry Initial Exam 2011-301 Draft Sim/IN-Plant JPMs.
- ML110760683 - Browns Ferry Initial Exam 2011-301 Final RO Written Exam with References.
- ML111010593 - Browns Ferry Initial Exam 2011-301 Final RO-SRO Written Exam Working copy.
- ML111010368 - Browns Ferry Initial Exam 2011-301 Draft Administrative JPMs.
- ML110980764 - Browns Ferry Initial Exam 2011-301 Draft SRO Written Exam.
- ML111010606 - Browns Ferry Initial Exam 2011-301 Final Simulator Scenarios.
- ML110980768 - Browns Ferry Initial Exam 2011-301 Draft Simulator Scenarios.
- ML110980758 - Browns Ferry Initial Exam 2011-301 Draft RO Written Exam.
- ML111020054 - Browns Ferry Initial Exam 2011-301 General Correspondence.
- ML110980756 - Browns Ferry Initial Exam 2011-301 Draft Administrative Documents.
- ML111010548 - Browns Ferry Initial Exam 2011-301 Final Administrative Documents.
- ML110760682 - Browns Ferry Initial Exam 2011-301 Final SRO Written Exam with References.
- ML111020053 - Browns Ferry Initial Exam 2011-301 Final Administrative JPMs.
- ML111010634 - Browns Ferry Initial Exam 2011-301 Final Sim-IN Plant JPMs.
- ML13189A133 - Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Barr, Units 1, Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project Plan.
- ML13191A882 - Browns Ferry Initial 2013-301 Reactor Operator and Senior Reactor Operator Initial License Written Examinations - Post Examination Response.
- ML111300255 - Browns Ferry 2011301 Security Agreement.
- ML12318A362 - Browns Ferry Initial Exam 2012-301 Final Simulator Scenarios.
- ML12318A359 - Browns Ferry Initial Exam 2012-301 Final Sim IN-Plant JPMs.
- ML12318A357 - Browns Ferry Initial Exam 2012-301 Draft Administrative Documents.
- ML12331A316 - Browns Ferry Initial Exam 2012-301 Draft Sim IN-Plant JPMs.
- ML12331A314 - Browns Ferry Initial Exam 2012-301 Final Administrative JPMs.
- ML13197A384 - Press Release-II-13-048: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Browns Ferry Nuclear Plant.
- ML13172A002 - Browns Ferry Nuclear Plant, Unit 3 - Transmittal of Final Accident Sequence Precursor (ASP) Analysis.
- ML13177A352 - Browns Ferry Nuclear Plant Review of Commitment Submittal for License Renewal Regarding the One-Time Inspection Procedure (TAC ME7797, ME7798, AND ME7799).
Sunday, July 14, 2013
NRC docs for Browns Ferry for 7/6/13 - 7/13/13; Synth1/presets
- ML13178A282 - Browns Ferry, Units 1, 2 and 3 - Answer to June 6, 2013 Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109).
- ML13183A189 - Aerial Radiological Survey of the Brown Ferry Nuclear Power Station - 1985.
- ML13191A172 - 07/24/2013 Notice of Category 1 Meeting - Regulatory Conference Browns Ferry.
- ML13183A058 - Browns Ferry Nuclear Plant, Unit 2, Tennessee Valley Authority - Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant, Unit 2 Seismic Walkdown.
- ML13191A893 - 2012 Browns Ferry Annual Assessment Meeting Slides.
- ML13191A898 - Browns Ferry 95003 Part 3 Public Exit Meeting.
- ML13190A487 - June 2013 - Browns Ferry NRC Generic Fundamentals Examination Results Letter.
I enjoy playing around with Synth1. If you're interested in creating music, give it a look. In conjunction with Synth1, I use several other VST instruments/effects. I ran across some recent presets for Synth1 today. Pretty decent...
Saturday, July 06, 2013
NRC docs in ADAMS for Browns Ferry 6/29 - 7/6/13; Rain, rain, go away...
- ML13178A125 - IR 05000259, 05000260, 05000296-13-503, on 06/03/2013, 06/07/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection.
- ML13179A141 - Browns Ferry - Operator Licensing Written Examination Approval 05000259-13-301, 05000260-13-301 AND 05000296-13-301.
- ML13183A212 - Press Release-II-13-046: NRC Schedules Public Meeting to Discuss Browns Ferry Nuclear Plant.
Rain, rain, go away...
Thursday, July 04, 2013
Monday, July 01, 2013
NRC docs for Browns Ferry - week of 6/22 - 6/29/13
- ML13169A246 - LER 13-001-01 for Browns Ferry Nuclear Plant, Unit 1, Regarding Latent Design Input Inconsistencies Adversely Affect Probable Maximum Flood Analysis.
- ML13157A150 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Staff Assessment of Licensee's Response to Information Request Pursuant to 10 CFR 50.54(f) Letter - Recommendation 9.3, Communications (TAC NOS. ME9993, ME9994, and ME9995).
- ML13177A443 - IR 05000259-13-007, 05000260-13-007, 05000296-13-007, 05000259-13-404, 05000260-13-404, 05000296-13-404; TNV; 01/28/2013 - 02/28/2013; Browns Ferry Plant Units 1, 2, and 3, Component Design Bases Inspection Report.
- ML13178A353 - 07/11/2013 Notice of Meeting With Tennessee Valley Authority to Discuss The Annual Assessment & Inspection Procedure 95003 Supplemental Inspection for Browns Ferry Nuclear Plant.
Sunday, June 23, 2013
NRC docs placed into ADAMS for Browns Ferry for the week of 6/15/13 - 6/22/13
- ML13115A888 - June 2013 Evacuation Time Estimates (ETE) Review Letter.
- ML13161A351 - Tennessee Valley Authority (TVA) - Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident for....
- ML13165A342 - 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers.
- ML13162A404 - LER 13-002-01 for Browns Ferry Nuclear Plant, Unit 3, Regarding Manual Actuation of Reactor Core Isolation Cooling System During Reactor Shutdown.
- ML13157A164 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - RAI Re. Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)(TAC MF0881 - MF0883).
Sunday, June 16, 2013
Happy Father's Day!
Happy Father's Day!
-
NRC docs regarding Browns Ferry for the week of 6/8/13 - 6/15/13
- ML13151A029 - Browns Ferry, Units 1, 2 and 3, Correction and Clarification of Proprietary Information Determination Regarding Response to Request for Additional Information Regarding BWRVIP- 25 Core Plate Bolt Stress Analysis (TAC Nos. ME6615, ME6616, and ME6617).
- ML13162A780 - IR 05000260-13-012, on 06-11-2013, Browns Ferry, Preliminary White Finding Letter.
- ML13151A377 - Impact of Fukushima-Related Activities on NRC Operating Reactor Regulatory and Licensing Reviews.
Sunday, June 09, 2013
NRC docs placed in ADAMS regarding Browns Ferry for the week of 6/1/13 - 6/8/13
- ML13151A022 - Browns Ferry, Units 1, 2 and 3 - Notification of 10 CFR Part 21 Final Report - Diesel Generator Fuel Injectors Failed a Pressure Test.
- ML13150A060 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Non-Proprietary - Draft Review of Tennessee Valley Authority Commitment Related to Core Plate Bolt Stress Analysis (TAC NOS. ME6615, ME6616, and ME6617).
- ML13144A579 - LER 13-002-00 for Browns Ferry Nuclear Plant, Unit 1, Regarding Manual Reactor Shutdown Due to Decreasing Condenser Vacuum.
- ML13144A576 - Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2 and Watt Bar, Units 1 & 2, Report of Drug Testing Error In Accordance With 10 CFR 26.719(c)(1).
- ML13148A308 - Browns Ferry Nuclear Plant, Unit 2 - Relief Request (Rr) 2-ISI-29, for the Third 10-Year Inservice Inspection Interval (TAC NO. ME8854).
- ML13088A120 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Tennessee Valley Authority Commitment Related to Core Plate Bolt Stress Analysis (TAC Nos. ME6615, ME6616, and ME6617).
- ML13088A096 - Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Request for Withholding Information From Public Disclosure For Tennessee Valley Authority Commitment Related to Core Plate Bolt Stress Analysis (TAC Nos. ME6615, ME6616 and ME6617).
- ML13149A364 - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance Review Concerning LAR to Adopt NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," (TAC NOS. MF1185, MF1186, and MF1187).
- ML13092A392 - Browns Ferry, Units 1, 2 and 3, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report.
- ML13092A393 - Browns Ferry, Units 1, 2 and 3, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (Technical Specification Change TS-480).
- ML13143A331 - Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2.
Saturday, June 01, 2013
2 docs in ADAMS for Browns Ferry (5/25 - 6/1/13); Cotton Row footage via YouTube from the City of Huntsville
- ML13140A042 - Browns Ferry Nuclear Plant, Units 1, 2 and 3, Submittal of Annual Radiological Environmental Operating Report - 2012.
- ML13120A180 - Browns Ferry Nuclear Plant, Unit 2 - Relief Request 2-ISI-28, for the Third 10-Year Inservice Inspection Interval (TAC NO. ME8779).
I had already posted this on Facebook, but I figured I'd put it here as well. The City of Huntsville posted about an hour of footage from the Cotton Row Run. I finally show up between about 49:15 - 49:20...
Monday, May 27, 2013
Happy Memorial Day; NRC docs regarding Browns Ferry put into ADAMS for the week of 5/18 - 5/25/2013; Cotton Row 2013 10K and 5K results
Happy Memorial Day! The following picture was borrowed from the U.S. Department of Veterans Affairs Facebook page...

The following documents regarding Browns Ferry were posted in the NRC's ADAMS system for the week of 5/18/2013 - 5/25/2013:
Cotton Row 2013 10K and 5K results
10K Overall
10K By Age Groups
5K Overall
5K By Age Groups

The following documents regarding Browns Ferry were posted in the NRC's ADAMS system for the week of 5/18/2013 - 5/25/2013:
- ML13115A955 - Final ASP Analysis-Browns Ferry Nuclear Plant, Unit 3, Reactor Trip and Subsequent Loss of Offsite Power due Failure of Unit Station System Transformer Differential Relay (LER 296/12-004).
- ML13134A014 - LER 13-001-01, for Browns Ferry. Unit 3 Regarding Inoperable Emergency Diesel Generator Due to Failed Electric Generator Casing Fan Bearing.
- ML13142A329 - Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0.
Cotton Row 2013 10K and 5K results
10K Overall
10K By Age Groups
5K Overall
5K By Age Groups
Subscribe to:
Posts (Atom)