Monday, October 05, 2009

Hmmmm, where to begin?

So, I'm in the middle of a seven day stretch off of work. I've had a few chances to work OT, but I've been otherwise occupied. Friday and Saturday were right out. Suzy had business to attend to in Boaz on those days (btw, you can see her waaaay in the background in the first picture on page 11 of those pictures). We stopped to eat on the way home both nights. Friday night involved a fairly standard pizza buffet. Saturday night we tried Wintzell's Oyster House in Guntersville. I had heard some good and some bad opinions beforehand. Bad reviews notwithstanding, we liked it! Plus, Wintzell's is supposed to be coming to Huntsville in December. Yesterday was a day to work out. That started at 6 AM with my best friend. We all went to eat breakfast after that. Yesterday afternoon was reserved for time on the elliptical machine. Today has been mainly recovery time from a busy weekend. That was interrupted, of course, by an hour and a half of exercising. I really love to sweat...

We'll see what the rest of the week will hold. I know that I'm looking forward to trying something new for dinner tomorrow night...

Since I was slack about posting last week, the past two weeks of ADAMS info for Browns Ferry can be viewed by click "read more" below...


U1 & sitewide

1. Browns Ferry, Units 1, 2, & 3, Revised Schedule for Extended Power Uprate Amendment Request Review.

2. Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Bellefonte, Units 1 and 2, Change to Correspondence Addressee and Service List Update.

3. Browns Ferry Nuclear Plant, Unit 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; Watts Bar Nuclear Plant, Unit 1 & 2; and Bellefonte Nuclear Plant, Units 1 & 2 - Submission of Revision 20 to Tennessee Valley Authority Nuclear Quality Assurance Plan.

4. Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing Errors.

5. Browns Ferry Office of Investigations Case Number 2-2009-006 Synopsis Release.

6. Browns Ferry, Units 1, 2, & 3, Response to Request for Additional Information Regarding Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.

U2

1. LER 09-005-00 for Browns Ferry Nuclear Plant Unit 2, re: Reactor Motor Operated Valve Board 2D & Residual Heat Removal Subsystem Inoperable Longer Than Allowed by the Plant's Technical Specifications.

2. Browns Ferry, Unit 2, Nine-Month Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.

3. Browns Ferry, Unit 2, American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs - Summary Report for Cycle 15 Operation.

U3

Nothing additional

No comments: